Plan P8 Pipelines, P9 Auftrag (Akte/Plantafel/Abnahme), P12 Automationen
- WF-P8: Kanban-Board, Edit-Mode (nur Detailansicht), Gewonnen regel-basiert - WF-P9: Projekt-Akte + Rechnung v1, Plantafel (Heute<->Woche offline), Abnahme mehrstufig - WF-P12: Flow-Editor (Katalog/Canvas/Konfig, Start-Auswahl) + Verwaltung (Timeline, 24h-Undo) - D-FORM zurueckgestellt (Davids Mitarbeiter:in) Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
1 parent
ca078436df
commit
2de481bf25
46 files changed
+2578
-910
No files matched your search
@@ -0,0 +1,33 @@
|
||||
---
|
||||
kind: screen
|
||||
project: HiveGrid Screen Project
|
||||
ticket: D-PLAN
|
||||
package: WF-P9 Plantafel
|
||||
id: M01
|
||||
screen: Konflikt-Dialog
|
||||
typ: Modal
|
||||
umsetzung: Bauen
|
||||
status: Validiert
|
||||
route: "aus S01 bei Konflikt"
|
||||
subframe: ""
|
||||
---
|
||||
|
||||
# M01 — Konflikt-Dialog (»Trotzdem zuweisen?«)
|
||||
|
||||
## Ziel
|
||||
|
||||
Konflikte nicht verhindern, sondern **bewusst machen** — das Büro entscheidet informiert.
|
||||
|
||||
## Was das Tool können muss
|
||||
|
||||
- Klartext-Grund: »Max ist an dem Tag im Urlaub« / »Max ist bereits bei Projekt X verplant (9–12 Uhr)« / »außerhalb der Arbeitszeit«
|
||||
- Bei Doppelbelegung: der andere Einsatz verlinkt
|
||||
- Entscheidung: **»Trotzdem zuweisen«** oder abbrechen (Block springt zurück)
|
||||
|
||||
## Pattern / Archetyp
|
||||
|
||||
A5 Dialog (echtes Modal).
|
||||
|
||||
## Subframe
|
||||
|
||||
- (erst nach explizitem OK)
|
||||
@@ -0,0 +1,34 @@
|
||||
---
|
||||
kind: screen
|
||||
project: HiveGrid Screen Project
|
||||
ticket: D-PLAN
|
||||
package: WF-P9 Plantafel
|
||||
id: M02
|
||||
screen: Einsatz-Dialog
|
||||
typ: Modal/Panel
|
||||
umsetzung: Bauen
|
||||
status: Validiert
|
||||
route: "aus S01 (leerer Slot / Einsatz-Klick)"
|
||||
subframe: ""
|
||||
---
|
||||
|
||||
# M02 — Einsatz anlegen/bearbeiten
|
||||
|
||||
## Ziel
|
||||
|
||||
Einsatz in Sekunden anlegen — Mitarbeiter und Zeit sind vom Slot schon vorbelegt.
|
||||
|
||||
## Was das Tool können muss
|
||||
|
||||
- Vorbelegt: Mitarbeiter + Zeitraum (vom angeklickten Slot)
|
||||
- **Projekt wählen** (Auto-Complete) · Zeitraum anpassen · Notiz
|
||||
- Status setzen (Default: geplant)
|
||||
- Konflikt-Prüfung beim Speichern → ggf. [[M01 Konflikt-Dialog]]
|
||||
|
||||
## Pattern / Archetyp
|
||||
|
||||
A5 Dialog (echtes Modal).
|
||||
|
||||
## Subframe
|
||||
|
||||
- (erst nach explizitem OK)
|
||||
@@ -0,0 +1,44 @@
|
||||
---
|
||||
kind: screen
|
||||
project: HiveGrid Screen Project
|
||||
ticket: D-PLAN
|
||||
package: WF-P9 Plantafel
|
||||
id: S01
|
||||
screen: Plantafel
|
||||
typ: BESPOKE Grid
|
||||
umsetzung: Bauen
|
||||
status: Validiert
|
||||
route: "/projects/plantafel"
|
||||
subframe: ""
|
||||
---
|
||||
|
||||
# S01 — Plantafel (Desktop-Raster) ⭐
|
||||
|
||||
## Ziel
|
||||
|
||||
Das Büro verplant alle Monteure kollisionsfrei — auf einen Blick.
|
||||
|
||||
## Was das Tool können muss
|
||||
|
||||
- Raster: **Zeilen = Mitarbeiter, Spalten = Zeit** (Umschalter Tag/Woche/Monat)
|
||||
- Einsatz-Blöcke: Projekt-Titel, Status-Farbe (vom Board-Status), Adresse kurz
|
||||
- **Ziehen = verschieben, Kante ziehen = verlängern/kürzen**; Klick auf leeren Slot → [[M02 Einsatz-Dialog]]
|
||||
- **Konflikt-Marker** am Block (doppelt / Urlaub/krank aus HR / außerhalb Arbeitszeit); Zuweisung trotzdem möglich via [[M01 Konflikt-Dialog]]
|
||||
- Status-Kette je Einsatz: geplant → bestätigt → unterwegs → fertig/abgesagt
|
||||
- Mehrfachauswahl → **Bulk-Umplanung** auf anderen Monteur
|
||||
- Filter: Mitarbeiter (Rolle/Gruppe/Verfügbarkeit) + Projekt · Kalender-Sync-Marker je Einsatz
|
||||
|
||||
## Pattern / Archetyp
|
||||
|
||||
**BESPOKE** — Scheduling-Grid.
|
||||
|
||||
## Zustände
|
||||
|
||||
| Zustand | Beschreibung | Umsetzung |
|
||||
|---|---|---|
|
||||
| Leer | »Noch keine Einsätze in diesem Zeitraum« | Nur dokumentieren |
|
||||
| Laden / Fehler / kein Zugriff | A7 | Wiederverwenden |
|
||||
|
||||
## Subframe
|
||||
|
||||
- (erst nach explizitem OK)
|
||||
@@ -0,0 +1,42 @@
|
||||
---
|
||||
kind: screen
|
||||
project: HiveGrid Screen Project
|
||||
ticket: D-PLAN
|
||||
package: WF-P9 Plantafel
|
||||
id: S02
|
||||
screen: Meine Termine
|
||||
typ: BESPOKE-Mobile (offline)
|
||||
umsetzung: Bauen
|
||||
status: Validiert
|
||||
route: "Handy / Bottom-Nav »Heute«"
|
||||
subframe: ""
|
||||
---
|
||||
|
||||
# S02 — Meine Termine 📱 (Heute ↔ Woche)
|
||||
|
||||
## Ziel
|
||||
|
||||
Der Monteur weiß immer, wo er als Nächstes hin muss — auch im Keller ohne Netz.
|
||||
|
||||
## Was das Tool können muss
|
||||
|
||||
- **Heute-Liste** (Hauptansicht): je Einsatz Projekt, Zeit, **Adresse + Navi-Link**, Ansprechpartner mit Anruf-Knopf
|
||||
- **Status per Tipp**: bestätigt → unterwegs → fertig
|
||||
- Umschalter oben: **Heute ↔ Woche** (kompakte Wochen-Sicht) — ein Frame, validiert
|
||||
- Einsatz antippen → Projekt-Mobil-Modus (WF-P9 Projekt-Akte S02)
|
||||
- **Offline-fähig**: Liste gecacht, Status-Tipps werden bei Verbindung nachgereicht (Sync-Status sichtbar)
|
||||
|
||||
## Pattern / Archetyp
|
||||
|
||||
📱 BESPOKE-Mobile, große Touch-Ziele, Bottom-Nav-Einstieg »Heute«.
|
||||
|
||||
## Zustände
|
||||
|
||||
| Zustand | Beschreibung | Umsetzung |
|
||||
|---|---|---|
|
||||
| Offline | Banner »offline — Änderungen werden nachgereicht« + Sync-Status | Nur dokumentieren |
|
||||
| Keine Termine heute | »Heute keine Einsätze« | Nur dokumentieren |
|
||||
|
||||
## Subframe
|
||||
|
||||
- (erst nach explizitem OK)
|
||||
@@ -0,0 +1,21 @@
|
||||
{
|
||||
"nodes":[
|
||||
{"id":"md-paket","type":"file","file":"02 Wireframes/P9 Auftrag/WF-P9 Plantafel/WF-P9 Plantafel.md","x":-80,"y":-440,"width":460,"height":280},
|
||||
{"id":"group-desktop","type":"group","x":-80,"y":-100,"width":1140,"height":380,"label":"Büro (Desktop, Bespoke)"},
|
||||
{"id":"group-dialoge","type":"group","x":-80,"y":460,"width":1140,"height":380,"label":"Dialoge"},
|
||||
{"id":"group-mobil","type":"group","x":1200,"y":-100,"width":1120,"height":380,"label":"Monteur 📱 (offline)"},
|
||||
{"id":"note-entry","type":"text","text":"# Einstieg\n\nSidebar → Plantafel.\n\nKonflikte gespeist aus HR (Urlaub/krank) + Kalender-Abgleich.","x":0,"y":0,"width":360,"height":200},
|
||||
{"id":"s01","type":"file","file":"02 Wireframes/P9 Auftrag/WF-P9 Plantafel/Screens/S01 Plantafel.md","x":560,"y":0,"width":420,"height":200},
|
||||
{"id":"m02","type":"file","file":"02 Wireframes/P9 Auftrag/WF-P9 Plantafel/Screens/M02 Einsatz-Dialog.md","x":0,"y":560,"width":420,"height":200},
|
||||
{"id":"m01","type":"file","file":"02 Wireframes/P9 Auftrag/WF-P9 Plantafel/Screens/M01 Konflikt-Dialog.md","x":580,"y":560,"width":420,"height":200},
|
||||
{"id":"s02","type":"file","file":"02 Wireframes/P9 Auftrag/WF-P9 Plantafel/Screens/S02 Meine Termine.md","x":1240,"y":0,"width":420,"height":200},
|
||||
{"id":"note-mobil","type":"text","text":"# Monteur-Einstieg\n\nBottom-Nav »Heute«. Ein Frame mit Umschalter Heute ↔ Woche (validiert). Tipp auf Einsatz → Projekt-Mobil-Modus.","x":1800,"y":0,"width":460,"height":200}
|
||||
],
|
||||
"edges":[
|
||||
{"id":"e-entry","fromNode":"note-entry","fromSide":"right","toNode":"s01","toSide":"left","toEnd":"arrow","styleAttributes":{"path":"dotted"}},
|
||||
{"id":"e-slot","fromNode":"s01","fromSide":"bottom","toNode":"m02","toSide":"top","toEnd":"arrow","label":"Slot-Klick / Einsatz öffnen"},
|
||||
{"id":"e-konflikt","fromNode":"m02","fromSide":"right","toNode":"m01","toSide":"left","toEnd":"arrow","label":"bei Konflikt"},
|
||||
{"id":"e-drag","fromNode":"s01","fromSide":"bottom","toNode":"m01","toSide":"top","toEnd":"arrow","label":"Drag&Drop bei Konflikt","styleAttributes":{"path":"long-dashed"}},
|
||||
{"id":"e-mobil","fromNode":"note-mobil","fromSide":"left","toNode":"s02","toSide":"right","toEnd":"arrow","styleAttributes":{"path":"dotted"}}
|
||||
]
|
||||
}
|
||||
@@ -0,0 +1,118 @@
|
||||
---
|
||||
kind: wireframe-package
|
||||
project: HiveGrid Screen Project
|
||||
ticket: D-PLAN
|
||||
package: WF-P9 Plantafel
|
||||
typ: Flow
|
||||
status: Validiert
|
||||
subframe: ""
|
||||
canvas: "WF-P9 Plantafel.canvas"
|
||||
---
|
||||
|
||||
# WF-P9 Plantafel
|
||||
|
||||
Status: Validiert (Screen-Liste)
|
||||
Subframe-Link: -
|
||||
Canvas: [Canvas](<WF-P9 Plantafel.canvas>)
|
||||
Stand: 2026-07-09
|
||||
|
||||
---
|
||||
|
||||
## 1. Kurzfassung
|
||||
|
||||
Die Einsatzplanung: Raster Mitarbeiter × Zeit mit Drag&Drop, Konflikt-Warnungen (Doppelbelegung, Urlaub/krank aus HR, Arbeitszeit) — und der offline-fähige Monteur-Handy-Modus »Meine Termine heute/Woche«. **Bespoke, höchste Priorität nach dem Flow-Editor.**
|
||||
|
||||
---
|
||||
|
||||
## 2. Intent Check
|
||||
|
||||
| Frage | Antwort |
|
||||
|---|---|
|
||||
| Ticket/Modul | D-PLAN, Dev-Pendant R-P9a/R-P9b |
|
||||
| Nutzer-Ziel | Büro: Monteure kollisionsfrei verplanen · Monteur: wissen, wo er heute hin muss — auch ohne Netz |
|
||||
| Quellen geprüft | `ticket-docs/D-PLAN.md`, ENTITY-MODEL Domäne 5, HiveGrid Map |
|
||||
| Sicher im Scope | Desktop-Raster, Einsatz-Dialog, Konflikt-Dialog, Monteur-Modus (Heute + Woche), Kalender-Sync-Marker |
|
||||
| Sicher nicht im Scope | Material-Ausgang, Zeiterfassung, Leistungspositionen (v2); Abnahme (eigenes Paket) |
|
||||
| Unsichere Annahmen | — |
|
||||
|
||||
---
|
||||
|
||||
## 3. Scope
|
||||
|
||||
| Punkt | Inhalt |
|
||||
|---|---|
|
||||
| Startpunkt | Sidebar »Plantafel« (Desktop) · Bottom-Nav »Heute« (Monteur) |
|
||||
| Ziel | Einsatz geplant/verschoben ohne Konflikt · Monteur beim Kunden |
|
||||
| Haupt-Archetyp | **BESPOKE** (Grid) + 📱 offline |
|
||||
| Out of scope | v2-Themen s. o. |
|
||||
|
||||
---
|
||||
|
||||
## 4. Entscheidungen (validiert 2026-07-09)
|
||||
|
||||
| Entscheidung | Status | Notiz |
|
||||
|---|---|---|
|
||||
| Monteur-Modus als EIN Frame mit Umschalter Heute ↔ Woche | genommen | Heute-Liste ist die Hauptansicht |
|
||||
| Konflikt-Dialog »Trotzdem zuweisen?« wird gebaut | genommen | Klartext-Grund (doppelt / Urlaub / krank / außerhalb Arbeitszeit) + bewusste Entscheidung |
|
||||
| Einsatz-Dialog (Klick auf leeren Slot / Einsatz) | genommen | Projekt wählen, Zeitraum, Notiz; Status-Kette geplant→bestätigt→unterwegs→fertig/abgesagt |
|
||||
| Status-Farbe der Einsätze = Board-Status des Projekts | genommen | Ticket-Vorgabe (pipeline-basiert) |
|
||||
| Konflikte kommen aus HR (Urlaub/krank) + Kalender | genommen | Querverbindungen aus der Map |
|
||||
|
||||
### Happy Path
|
||||
|
||||
1. Büro öffnet Plantafel (Woche), sieht alle Monteure als Zeilen.
|
||||
2. Einsatz per Klick auf freien Slot anlegen oder per Ziehen verschieben/verlängern.
|
||||
3. Konflikt? Dialog erklärt in Klartext, warum — zuweisen geht trotzdem (bewusst).
|
||||
4. Monteur am Handy: »Heute« — Liste mit Adresse + Navi-Link, Status per Tipp (unterwegs → fertig). Funktioniert offline, synct später.
|
||||
|
||||
### Meldungs-/Error-States (validiert)
|
||||
|
||||
| Ereignis | UI-Form | Blockiert? | Bauen? | Copy/Notiz |
|
||||
|---|---|---|---|---|
|
||||
| Konflikt beim Zuweisen | Dialog »Trotzdem zuweisen?« | ja (Aktion) | Bauen (M01) | Klartext-Grund |
|
||||
| Offline (Monteur) | Hinweis + Sync-Status | nein | Nur dokumentieren | Status-Tipps werden nachgereicht |
|
||||
| Kalender-Sync aktiv | kleiner Marker am Einsatz | nein | Nur dokumentieren | — |
|
||||
| Leere Tafel | Leer-Zustand + CTA | nein | Nur dokumentieren | — |
|
||||
|
||||
---
|
||||
|
||||
## 7. Validierte Screen-Liste
|
||||
|
||||
| ID | Screen/Zustand | Typ | Umsetzung | Ort | Status |
|
||||
|---|---|---|---|---|---|
|
||||
| S01 | Plantafel (Desktop-Raster) ⭐ | BESPOKE | Bauen | `/projects/plantafel` | Validiert |
|
||||
| S02 | Meine Termine 📱 (Heute ↔ Woche) | BESPOKE-Mobile, offline | Bauen | Handy / Bottom-Nav »Heute« | Validiert |
|
||||
| M01 | Konflikt-Dialog (»Trotzdem zuweisen?«) | Modal | Bauen | aus S01 | Validiert |
|
||||
| M02 | Einsatz anlegen/bearbeiten | Modal/Panel | Bauen | aus S01 (Slot-Klick) | Validiert |
|
||||
| D01–D03 | Offline/Sync-Marker/Leer (s. Tabelle) | Inline | Nur dokumentieren | — | Validiert |
|
||||
|
||||
---
|
||||
|
||||
## 8. Grid
|
||||
|
||||
```text
|
||||
Sidebar -> S01 (Raster: Y=Mitarbeiter, X=Zeit, Tag/Woche/Monat)
|
||||
S01 -> M02 (Slot-Klick: Einsatz anlegen/bearbeiten)
|
||||
M02/Drag&Drop -> M01 (bei Konflikt)
|
||||
Monteur-Handy -> S02 (Heute <-> Woche, offline) -> Projekt-Mobil-Modus (WF-P9 Projekt-Akte S02)
|
||||
Konflikte gespeist aus: HR (Urlaub/krank) + Kalender-Abgleich
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## 9. Screen-Pakete
|
||||
|
||||
- [[S01 Plantafel]] · [[S02 Meine Termine]] · [[M01 Konflikt-Dialog]] · [[M02 Einsatz-Dialog]]
|
||||
|
||||
---
|
||||
|
||||
## 10. Offene Fragen
|
||||
|
||||
- Bulk-Reassign-UX (mehrere Einsätze auf anderen Monteur): Auswahl-Modus im Raster — Feinschliff beim Subframe-Bau
|
||||
- Zeitraster-Granularität (Stunden vs. Halbtage) → Dev/Subframe-Bau
|
||||
|
||||
## Handoff-Check
|
||||
|
||||
- [x] Jeder Screen ist mit Umsetzung markiert.
|
||||
- [x] Meldungs-/Error-State-Matrix ist ausgefüllt.
|
||||
- [ ] Subframe-Link ist eingetragen. *(Subframe erst nach explizitem OK)*
|
||||
Reference in new issue
Block a user