152 lines
4.9 KiB
Markdown
152 lines
4.9 KiB
Markdown
# HiveGrid Intel — Synthesis Entry Point
|
||
|
||
generated: 2026-06-07
|
||
mode: new (net-new bootstrap)
|
||
precedence: ADR > SPEC > PRD > DOC
|
||
|
||
---
|
||
|
||
## Doc Counts by Type
|
||
|
||
Total: 38 documents classified
|
||
|
||
- ADR: 1 (docs/ARCHITECTURE-DECISIONS.md) — consolidated, 19 individual decisions extracted
|
||
- SPEC: 37 (36 module specs + 1 INTEGRATION-CONTRACTS)
|
||
- PRD: 0
|
||
- DOC: 0
|
||
- UNKNOWN: 0
|
||
|
||
All docs: confidence=high, manifest_override=true. No low-confidence unknowns.
|
||
|
||
---
|
||
|
||
## Decisions Locked
|
||
|
||
Count: 17 locked decisions (AD-1 through AD-5, AD-8 through AD-19)
|
||
|
||
Not locked (Backlog): AD-6 (EU-Email-Provider), AD-7 (Captcha/Bot-Schutz)
|
||
|
||
Source: docs/ARCHITECTURE-DECISIONS.md
|
||
|
||
Locked decision source paths:
|
||
- /Users/raffaelsheikh/Documents/GitHub/HiveGrid-Cloud/docs/ARCHITECTURE-DECISIONS.md
|
||
|
||
---
|
||
|
||
## Requirements Extracted
|
||
|
||
Count: 79 requirements (REQ-{slug} entries across 37 SPECs)
|
||
|
||
Module distribution:
|
||
- M01 CRM-Kern: 8 requirements (REQ-crm-datenmodell through REQ-crm-permissions)
|
||
- M02 Lead-Inbox: 6 requirements
|
||
- M03 Sales-Pipeline: 5 requirements
|
||
- M04 Auftrags-/Projektpipeline: 3 requirements
|
||
- M05 Form-Builder: 3 requirements
|
||
- M06 Booking: 3 requirements
|
||
- M07 Angebot+Signatur: 2 requirements
|
||
- M09 Email-Inbox: 3 requirements
|
||
- M10 Email-Marketing: 3 requirements
|
||
- M12 Telefonie: 2 requirements
|
||
- M13 Team-Chat: 3 requirements
|
||
- M14 HR-Hub: 3 requirements
|
||
- M15 Customer-Portal: 3 requirements
|
||
- M17 Automation-Engine: 5 requirements
|
||
- M18 KI-Layer: 4 requirements
|
||
- M19 KWP-Integration: 3 requirements
|
||
- M20 Dashboard: 2 requirements
|
||
- M21 Audit-Log: 3 requirements
|
||
- M22 Notifications: 2 requirements
|
||
- M23 Files: 2 requirements
|
||
- M24 Globale Suche: 3 requirements
|
||
- M25 Calendar-Sync: 2 requirements
|
||
- M26 Tasks: 2 requirements
|
||
- M27 Auth/Multi-Tenancy: 5 requirements
|
||
- M28 Billing: 2 requirements
|
||
- M29 Onboarding: 2 requirements
|
||
- M30 i18n: 2 requirements
|
||
- M31 Branding: 2 requirements
|
||
- M32 Feature-Flags: 1 requirement
|
||
- M33a Apps-Engine: 2 requirements
|
||
- M34 Public-API: 2 requirements
|
||
- M35 DSGVO-Export: 2 requirements
|
||
- M36 Mobile-App: 3 requirements
|
||
- M37 Plattform-Admin: 2 requirements
|
||
- M38 Help-Center: 1 requirement
|
||
- M39 Help-Desk: 1 requirement
|
||
- INTEGRATION-CONTRACTS: 6 cross-cutting requirements
|
||
|
||
---
|
||
|
||
## Constraints Extracted
|
||
|
||
Count: 25 constraints (C-01 through C-25)
|
||
|
||
Type breakdown:
|
||
- schema: 7 (C-01, C-02, C-03, C-06, C-18, C-19, C-22)
|
||
- api-contract: 6 (C-09, C-10, C-11, C-12, C-13, C-14, C-15)
|
||
- protocol: 7 (C-04, C-07, C-08, C-16, C-23, C-24, C-21)
|
||
- nfr: 5 (C-05, C-17, C-20, C-25)
|
||
|
||
Note: C-15 spans both api-contract and protocol categories.
|
||
|
||
---
|
||
|
||
## Context Topics Extracted
|
||
|
||
Count: 7 topics
|
||
|
||
Topics: Projekt-Überblick und Ziel, Phase-0-Pflichten, Delivery-Sequenzierung, SHK-Branchen-Kontext, Boilerplate-Reuse-Struktur, KWP-Recut-Entscheidung, Spec-Status
|
||
|
||
---
|
||
|
||
## Conflict Detection Summary
|
||
|
||
Blockers: 0
|
||
Competing variants: 0
|
||
Auto-resolved: 4
|
||
|
||
All conflicts are INFO-level (auto-resolved by ADR > SPEC precedence). No user action required to proceed.
|
||
|
||
---
|
||
|
||
## Cycle Detection
|
||
|
||
Result: No cycles detected.
|
||
|
||
38 docs processed. Cross-ref graph is acyclic (DFS three-color: all refs einseitig). External refs to non-classified docs (AGENTS.md, brainstorming-session-2026-05-07-2206.md, M11-whatsapp.md, milestone PLAN files) are out-of-set and do not form cycles.
|
||
|
||
---
|
||
|
||
## Intel Files
|
||
|
||
decisions.md — 19 ADR-Decisions (AD-1 through AD-19), Phase-0-Pflichten, KWP-Recut
|
||
path: /Users/raffaelsheikh/Documents/GitHub/HiveGrid-Cloud/.planning/intel/decisions.md
|
||
|
||
requirements.md — 79 REQ-{slug} entries from 37 SPECs, with acceptance criteria
|
||
path: /Users/raffaelsheikh/Documents/GitHub/HiveGrid-Cloud/.planning/intel/requirements.md
|
||
|
||
constraints.md — 25 technical constraints (schema, api-contract, nfr, protocol)
|
||
path: /Users/raffaelsheikh/Documents/GitHub/HiveGrid-Cloud/.planning/intel/constraints.md
|
||
|
||
context.md — 7 supporting context topics, cross-cutting notes
|
||
path: /Users/raffaelsheikh/Documents/GitHub/HiveGrid-Cloud/.planning/intel/context.md
|
||
|
||
---
|
||
|
||
## Conflicts Report
|
||
|
||
Aufgelöst — alle Ingest-Konflikte sind als ADRs in `docs/ARCHITECTURE-DECISIONS.md` gelockt (das Bootstrap-Artefakt `INGEST-CONFLICTS.md` wurde entfernt).
|
||
|
||
---
|
||
|
||
## Downstream Consumer Notes (for gsd-roadmapper)
|
||
|
||
1. All locked ADR decisions in decisions.md are binding. Do not override without a new ADR entry.
|
||
2. AD-6 and AD-7 are explicitly NOT locked — downstream planning may defer or pick.
|
||
3. KWP-Recut (M19): current spec describes Windows-Client variant. Re-cut M089–M095 scope before routing M19.
|
||
4. AD-5 (Meilisearch): requires self-hosted Meilisearch infra as prerequisite before M24 implementation.
|
||
5. Phase-0-Pflichten must precede any module implementation milestone (see decisions.md Phase-0 section).
|
||
6. M11-whatsapp.md (referenced by M13, M18) is NOT in this ingest set — Phase 2, not yet spec'd.
|
||
7. SHK-Branchen-Templates (M12, M27, M03, M04, M29) are deferred for Noah/Geerkens validation — not blockers.
|